{"id":9886,"date":"2026-08-06T00:42:14","date_gmt":"2026-08-06T00:42:14","guid":{"rendered":"https:\/\/futureknowledge.in\/?p=9886"},"modified":"2026-08-06T00:42:14","modified_gmt":"2026-08-06T00:42:14","slug":"a-controversial-plan-to-update-line-5-just-suffered-a-major-loss-at-the-michigan-supreme-court","status":"publish","type":"post","link":"https:\/\/futureknowledge.in\/?p=9886","title":{"rendered":"A controversial plan to update Line 5 just suffered a major loss at the Michigan Supreme Court"},"content":{"rendered":"<p>In a win for opponents of Enbridge Energy\u2019s Line 5 pipeline, the Michigan Supreme Court vacated a key permit last week for a proposed project that would replace a segment of the pipeline running underneath an environmentally-sensitive area of the Great Lakes, finding that a state commission did not examine the full scope of possible harm to the environment.<\/p>\n<p>Following the 6-1 decision, the justices remanded the permit back to the Michigan Public Service Commission for a more thorough review, which likely extends the timeline for a decision on a project that\u2019s already been mired in legal and procedural hurdles for years.\u00a0<\/p>\n<p>Enbridge Energy received the permit in 2023 for its proposal to replace a segment of the oil and natural gas liquids pipeline \u2014 which connects lakes Michigan and Huron via the Straits of Mackinac \u2014 with a new one encased in a tunnel buried in the lakebed. Environmental groups and tribal nations appealed the decision, landing the case before the state\u2019s highest court this year.<\/p>\n<p>Writing for a nearly unanimous court in a 58-page opinion, Justice Elizabeth Welch said that the commission didn\u2019t consider the full range of potential environmental harms, nor did it look at how the project would impact the public\u2019s right to use the state\u2019s natural resources, which includes the Great Lakes \u2014 protections granted under the state\u2019s public trust doctrine.<\/p>\n<p>To support our nonprofit environmental journalism, please consider disabling your ad-blocker to allow ads on Grist. Here&#039;s How<\/p>\n<p>\u201cWe cannot fault (the commission) for this failure, because there was little authority on this issue prior to our decision today. Even so, it was error,\u201d the opinion stated.<\/p>\n<p>Justices found that the commission incorrectly limited its scope of review under the Michigan Environmental Protection Act to just the tunnel, when it should have examined how the project would impact the broader pipeline. Line 5 transports crude oil and natural gas liquids 645 miles from Superior, Wisconsin, through Michigan to Sarnia, Ontario, with 4.5 miles of the pipeline crossing the straits.\u00a0<\/p>\n<p>In its new review, the justices said that the public service commission must answer whether the tunnel project will extend the lifespan of the 73-year-old pipeline, and if it does, determine what impacts there are to the environment and to the public trust.<\/p>\n<p>\u201cIt is impossible to prevent or mitigate an environmental risk without understanding the nature of that risk,\u201d the justices wrote.<\/p>\n<p>To support our nonprofit environmental journalism, please consider disabling your ad-blocker to allow ads on Grist. Here&#039;s How<\/p>\n<p>Lawyers for the plaintiffs \u2014 four tribal nations across Michigan and three environmental groups \u2014 argued that because the tunnel project would extend the pipeline\u2019s lifespan, it causes harm by increasing the risk of oil spills along Line 5\u2019s entirety and increased greenhouse gas emissions from the fossil fuels it transports.<\/p>\n<p>\u201cThe court has made clear that our understanding of environmental harm, it\u2019s a practical understanding, but it\u2019s also a broad one,\u201d said Chad Hughes, senior attorney for the Environmental Law &amp; Policy Center, which argued with the plaintiffs. \u201cThere\u2019s no requirement to narrowly focus on the physical location of the project. You look at the environmental harms where they happen.\u201d<\/p>\n<p>By broadening the scope of reviews under the Michigan Environmental Protection Act, opponents said conversations about shutting down the entire pipeline are finally a possibility. The justices wrote that \u201ca meaningful examination\u201d of alternatives can\u2019t happen until the commission determines the full impacts of the project.<\/p>\n<p>\u201cThe door has been kicked open to an imaginable future where we can talk about alternatives other than Line 5,\u201d said President Whitney Gravelle of the Bay Mills Indian Community, one of the plaintiffs in the case.<\/p>\n<p>In a statement, Enbridge spokesperson Ryan Duffy wrote that the company disagrees and is disappointed by the ruling, calling it an additional delay to a project that has already been under review for nearly a decade. Enbridge is reviewing the opinion and assessing legal options, he said.<\/p>\n<p><em>Source: <a href='https:\/\/grist.org\/energy\/controversial-plan-line-5-major-loss-michigan-supreme-court\/' target='_blank'>Read the original article on grist.org<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a win for opponents of Enbridge Energy\u2019s Line 5 pipeline, the Michigan Supreme Court vacated a key permit last week for a proposed project that would replace a segment of the pipeline running underneath an environmentally-sensitive area of the Great Lakes, finding that a state commission did not examine the full scope of possible [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9887,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37,3],"tags":[67,29,33],"class_list":["post-9886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commodities","category-technology","tag-impact-oil","tag-signal-avoid","tag-stage-stage-4"],"_links":{"self":[{"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/posts\/9886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9886"}],"version-history":[{"count":0,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/posts\/9886\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=\/wp\/v2\/media\/9887"}],"wp:attachment":[{"href":"https:\/\/futureknowledge.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/futureknowledge.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}